Design: In-Place Auto-Update

Status: draft plan; Phases 0.1, 0.3, 1 to 5 implemented, not hardware-qualified. The release workflow publishes the date-tagged releases (v2026.10.25 was the bootstrap release, see release/bootstrap-complete). See Implementation status.

Goal

Non-goals

OS updates and reboot

  1. The release pins an OS package set (release/os-packages.lock: exact kernel, GRUB, and library package versions).
  2. The release workflow measures the expected PCR 8/9 for that set on a reference VM image built in CI, and writes them into the approval next to the current values. The approval lists both, so servers attest each other during the rollout.
  3. Before a reboot the updater asks the server to stage the next boot chain: the server seals a second copy of its boot set to the new PCR 8/9 from the verified approval (storage design B6 and Phase 6 SealedBlobStore staging).
  4. The updater installs the packages, then reboots inside its upgrade turn. The health gate (Phase 4 step 7) runs after the reboot. On failure the updater boots the previous GRUB entry and halts the rollout. Before the install it copies the running kernel’s initramfs, which PCR 9 measures. A package can rebuild that image through a dpkg trigger. A release without a boot-chain change keeps PCR 8/9, so the updater puts the measured image back after the install; a rollback puts it back in every case.
  5. A release that does not change the boot chain restarts only the services, with no reboot.

Versioning

Phase 0: Gates (answer before code)

  1. In-place restart across an approval change (blocked today). The storage review (2026-10-24) found two blockers:
    • A stored bootstrap certificate commits one release approval, and recovery refuses a different one (SecurityDriver.cpp:228-234).
    • A ruleset version change changes network_id (SecurityMeshService.cpp:25-28). Storage records under the old id are then refused (StorageKeyService.cpp:538), and the node cannot unlock.

    Required design: a newer approval, signed by the Genesis-pinned release key with a higher release number, supersedes the committed one without Genesis. The Genesis commitment then binds the release signer and the network, not one approval digest. Releases keep the ruleset versions that feed network_id unchanged; a ruleset change is a separate, consensus-finalized transition, never a side effect of an update. This is a trust-model change, so it needs explicit review and a migration test. Owner approval: 2026-10-24, on the condition that it stays secure (fail closed, signer pinned by Genesis, monotonic release number, no downgrade).

    Implemented as follows (Security/Attestation/ReleaseChain.hpp). The bootstrap certificate format is unchanged and still commits the founding approval digest. That approval names the release signer and the network, so the commitment binds both. Each server keeps one release chain record beside its epoch state: the pinned signer, the digest of the approval that pinned it, the bound founding digest, the highest accepted release number, and the newest accepted approval. At restart the driver accepts the stored certificate when the founding approval it names carries the pinned signer for this network; it no longer requires the loaded approval digest. A different Genesis-signed release key is refused (WrongSigner), so Genesis cannot install a new release authority after Epoch 1. A release key rotation would need its own consensus-finalized transition.

  2. Holder margin. With 5 holders, t = 4. One server down is exactly survivable. Confirm that unlock and consensus continue while one Tier 1 server restarts.
  3. Fleet profile. The approval pins PCR 8/9, SVSM launch measurements, and system library hashes taken from the fleet (ceremony/fleet-libs). Move these inputs into a reviewed file in the repository (release/fleet-profile.json) so CI can build the approval without access to the VMs.

Phase 1: Release workflow (release.yml)

Trigger: workflow_dispatch only, from main.

  1. Compute the date version and release number. Fail if the tag exists.
  2. Build all targets in a matrix: server, nexus-attestd, SDK, Flutter clients, and .deb/.rpm packages. Server binaries build in a pinned container that matches the fleet toolchain, so hashes are reproducible.
  3. Generate the release approval with nexus-release-bundle from release/fleet-profile.json and the built hashes. The approval lists the new hashes and the previous release’s hashes (overlap window of one release).
  4. Sign the approval with the release key. The key is a secret in a GitHub environment release that only this workflow on main can read.
  5. Attach Sigstore build provenance (actions/attest-build-provenance) for every artifact.
  6. Create the tag and the GitHub release. Upload the artifacts, the signed approval, and a manifest (version, release number, hashes, wire versions).

Repository settings that this model depends on: branch protection on main (reviewed merges only), and workflow dispatch limited to maintainers.

Phase 2: Approval chain and adoption

  1. Verification. A server accepts an approval only when its signature verifies against the Genesis-pinned release key, its network id matches, and its release number is greater than the highest accepted number.
  2. Runtime adoption. A server that receives a newer valid approval over the backbone (from a peer or its own updater) stores it and uses it for attestation. This lets servers on release N attest a server on N+1.
  3. Overlap. Attestation accepts a binary hash listed in the newest accepted approval. Because each approval lists the previous release’s hashes too, N and N+1 attest each other during the rollout. N-1 stops passing once N+1 is adopted. After a halted rollout of N+1, servers run N+1 or N, so the fix lists the hashes of both (release guard, below).
  4. Persistence. The highest accepted release number survives restart. It is stored with the security state, not in a config file. Finalized consensus state anchors it against rollback (Known limits, Release record rollback).

Phase 3: Mixed-version compatibility

  1. Wire rule. Release N+1 must accept every message release N sends, and must not require a message N cannot send, until the whole mesh runs N+1. New message types and fields are additive; a feature that needs every server waits for a finalized “all servers on N+1” fact before it turns on.
  2. Storage rule. On-disk formats change only with a reader for the previous format.
  3. CI gate. A mixed-version test runs the previous release’s server binary (downloaded from the last GitHub release) with the new binary in one mesh: founding, epoch transition, tree ops, storage unlock, and attestation in both directions. The release workflow refuses to publish if it fails.

Phase 4: Updater

A separate small service, nexus-updater (systemd unit, path unit, and timer, runs as root). The server keeps no write access to /usr/bin. The updater holds no server keys.

  1. Poll the GitHub releases API: every 5 minutes on the timer, and at once when the server touches the wake marker (a rollout Start that names this server, or its Turn).
  2. Download the manifest, the approval, and the artifacts for this host.
  3. Verify: the approval (Phase 2 rules), the artifact hashes against the approval, and the Sigstore provenance (repository, release.yml, main). Any failure stops the update and logs why.
  4. Stage the files next to the installed ones. Hand the approval to the server for adoption (Phase 2).
  5. Wait for this server’s upgrade turn (Phase 5).
  6. Stop the server, swap the binaries and the approval atomically, keep the previous files, and start the server.
  7. Health gate, within a bounded time: the server reports the new version, passes attestation, resumes its epoch role, unlocks its data key, and catches up the tree log.
  8. On success, install the release’s updater binary over the running one (previous copy kept; the next cycle runs it) and report “upgraded”. On failure, restore the previous files, restart, and report “failed”. A failure halts the rollout for every server until a newer release appears.

Phase 5: One at a time, through consensus

  1. Order. For each release, the order is a deterministic ranking of admitted servers (hash of release number and node id). Tier 2 servers go first, then Tier 1, so a bad release fails on a non-voting server first.
  2. Turn. A server may restart only when finalized state shows that every server ahead of it reported “upgraded” for this release and no server is currently down. Turn state is a new consensus payload kind (UpgradeProgress, on the Phase 2 BlockPayload extension point). A server’s “upgraded” report counts only when a witness quorum observed the server attested and healthy on the new version.
  3. Safety rule. Never more than one Tier 1 server or storage holder down. If any holder is unreachable, the rollout waits.
  4. Halt. A “failed” report finalizes a halt for the release.

Phase 6: Bootstrap (one time)

Owner decision (2026-10-24): r21 is not a baseline. The first date-tagged release is the bootstrap release. Every server installs it once by hand, and the network is founded fresh on it. There is no storage state yet, so a fresh founding is safe at this point, and only at this point. Every release after that uses Phases 1-5 and installs in place.

  1. The release workflow detects the bootstrap release: no earlier date tag or date-tagged release exists, and release/bootstrap-complete does not exist. There is no manual switch. The bootstrap approval has no previous_release_paths, the rollout guard and the mixed-version gate do not run, and no r21 input is read.
  2. The founding uses the Genesis key behind network_id in release/fleet-profile.json, because the approval names that network. The founding certificate commits the bootstrap approval, and the release chain pins its signer at first start. The founding-approval migration file (kFoundingApprovalFile) is not part of this procedure.
  3. After every server runs the bootstrap release, a reviewed commit names its tag in release/bootstrap-complete. The next release refuses to publish until it does, because the bootstrap release has no rollout records to prove.

The operator steps are in Releasing, Bootstrap procedure.

Implementation status

Part State Where
0.1 Approval supersession Implemented ReleaseChain, SecurityDriver::start (release_commitment), ReleaseApproval format 3
0.2 Holder margin Open; see the restart defect below  
0.3 Fleet profile Implemented; seeded from r21 release/fleet-profile.json, ReleaseApproval.cpp (boot line verified against the approval only)
1 Release workflow Implemented; publishes the date-tagged releases .github/workflows/release.yml, scripts/nexus-release-tool, scripts/nexus-release-sign, Releasing
Release guards Implemented; run in every release run (the release after the bootstrap release or a hand-installed release uses the reviewed file instead of a rollout proof) Previous approval required; rollout proof (Security/Upgrade/RolloutProof.hpp, nexus-rollout-check, GET /api/upgrade/rollout-proof); fix after a halt (release_follows_rollout, nexus-release-bundle --previous-halted); mixed-version job; bootstrap detection (nexus-release-tool previous)
Release floor Implemented, memory-mesh tested ReleaseChain::raise_floor, UpgradeService (finalized Start records)
2 Approval chain and adoption Implemented ReleaseChain, UpgradeService (ApprovalOffer, status-driven exchange), AttestationService::replace_profile
3 Mixed-version gate Memory-mesh test in CI; multi-process job (wire checks only without SEV-SNP) tests/security/lifecycle/upgrade_path.cpp, scripts/mixed-version-mesh.sh, .github/workflows/mixed-version.yml, Wire Compatibility
4 Updater Implemented and unit tested projects/LemonadeNexusUpdater/, packaging/systemd/nexus-updater.*
5 Upgrade turns Implemented BlockPayloadKind::UpgradeProgress, Security/Upgrade/, Upgrade Control
OS updates and reboot Implemented and unit tested; the package lock lists no packages yet release/os-packages.lock, Core/BootChainStaging

Decisions made during implementation:

Details that the phases above leave open:

Known limits found during the implementation:

Tier 2 and the tree

Tier 2 servers are pure proxies of data and connections that are already encrypted end to end. They have no tree role: they do not read, write, redirect, or forward tree requests, and they do not terminate or vouch for a client session. Tier 2 servers do not store, replicate, or serve the tree at all; the Phase 3 replication to Tier 2 is removed. A server that leaves Tier 1 deletes its tree copy after its last epoch ends. Clients send every tree read and write directly to a Tier 1 server. The SDK selects Tier 1 servers from the finalized epoch membership and verifies that list; it never asks a Tier 2 server for tree data.

Tests

Risks